HOME Our Business Safety Certification(KCs-Mark) Types and Procedures Fee
※ The expense of Assessment on Technical Capability and Production System follows the announcement 2017-53 of Ministry of Employment and Labor.
Safety Certification Subject | Fee by Types of Safety Certification Assessment | ||||||
---|---|---|---|---|---|---|---|
Document Assessment | Product Assessment | ||||||
Crane | Ceiling, Gantry | Rated Load | Rated Load | ||||
Below 10-ton | 172,000 | Below 10-ton | 66,000 | ||||
Below 50-ton | 193,000 | Below 50-ton | 71,000 | ||||
Below 100-ton | 215,000 | Below 100-ton | 75,000 | ||||
100-ton or Above | 236,000 | 200-ton or Below | 79,000 | ||||
500-ton or Below | 101,000 | ||||||
Over 500-ton | 101,000 and additional 101,000 for every exceeding 500-ton. Yet, it may not be over 500,000 KRW. | ||||||
Hoist | 129,000 | Rated Load | |||||
Below 5-ton | 58,000 | ||||||
5-ton or Above | 62,000 | ||||||
Tower, Jib, or Other Mobile Ones | Rated Load | Rated Load | |||||
Below 50-ton | 215,000 | Below 10-ton | 101,000 | ||||
Below 50-ton | 107,000 | ||||||
50-ton or Above | 280,000 | 100-ton or Below | 116,000 | ||||
Over 100-ton | 116,000 and additional 116,000 for every exceeding 100-ton. Yet, it may not be over 500,000 KRW. | ||||||
Unloader | Rated Load | Rated Load | |||||
Below 30-ton | 323,000 | Below 30-ton | 168,000 | ||||
30-ton or Above | 430,000 | Below 50-ton | 216,000 | ||||
50-ton or Above | 259,000 | ||||||
Lift, Gondola | 107,000 | 53,000 | |||||
Pressure Vessel | Internal Volume | Type A | Type B | Internal Volume | Type A | Type B | |
Below 5-㎥ | 172,000 | 86,000 | Below 2-㎥ | 34,000 | 16,000 | ||
Below 5-㎥ | 43,000 | 19,000 | |||||
Below 30-㎥ | 193,000 | 107,000 | Below 30-㎥ | 64,000 | 24,000 | ||
30-㎥ or Above | 215,000 | 129,000 | 40-㎥ or Below | 77,000 | 32,000 | ||
100-㎥ or Below | 82,000 | 38,000 | |||||
Over 100-㎥ | 82,000 and additional 82,000 for every exceeding 100-㎥. Yet, it may not be over 500,000 KRW. | 38,000 and additional 38,000 for every exceeding 100-㎥. Yet, it may not be over 500,000 KRW. | |||||
Press, Shearing Machine, Press Brake | Pressure Capacity | Pressure Capacity | |||||
Below 200-ton | 140,000 | Below 50-ton | 34,000 | ||||
Below 200-ton | 43,000 | ||||||
200-ton or Above | 183,000 | 300-ton or Below | 51,000 | ||||
500-ton or Below | 62,000 | ||||||
Over 500-ton | 62,000 and additional 62,000 for every exceeding 500-ton. Yet, it may not be over 500,000 KRW. | ||||||
Roller | 140,000 | 49,000 | |||||
Injection Molding Machine | Clamping Force | Clamping Force | |||||
Below 2,942-kN | 140,000 | Below 294-kN | 34,000 | ||||
Below 2,942-kN | 43,000 | ||||||
2,942-kN or Above | 183,000 | 5,884-kN or Below | 51,000 | ||||
Over 5,884-kN | 51,000 and additional 51,000 for every exceeding 5,884-kN. Yet, it may not be over 500,000 KRW. | ||||||
Mobile Elevated Work Platform | 107,000 | 53,000 |
※ The expense of Assessment on Technical Capability and Production System follows the announcement 2017-53 of Ministry of Employment and Labor.
※ The product Assessment fee may vary by a type of product.
Safety Certification Subject | Document Assessment | |
---|---|---|
Industrial Safety Helmet | Type AB, Type AE, Type ABE | 46,000 |
Safety Shoes | Leather | 46,000 |
Rubber | ||
Electrostatic | ||
Top of Foot | ||
Insulation Shoes | ||
Insulation Boots | ||
Protective Gloves | For Voltage Resistance | 46,000 |
For Chemicals | ||
Dust Mask | 78,000 | |
Gas Mask | 78,000 | |
Air-line Mask | 78,000 | |
Powered Air Purifying Respirator | Powered Dust Mask | 93,000 |
Powered Gas Mask | ||
Powered Hood and Powered Welding Facial Shield | ||
Protective Clothes | Heatproof Clothes | 46,000 |
For Chemicals | ||
Safety Belt & Harness | For Belt-type U-shape Rack | 46,000 |
For Belt-type Individual Rack | ||
For Swing-type U-shape Rack | ||
For Swing-type Individual Rack | ||
Safety Block | ||
Fall Preventer | ||
Protective eye-protection | Light-shading Protective Goggle | 46,000 |
Welding Facial Shield | 46,000 | |
Hearing protectors | Earplug | 46,000 |
Earmuff |
※ The expense of Assessment on Technical Capability and Production System follows the announcement 2017-53 of Ministry of Employment and Labor.
Safety Certification Subject | Document Assessment | Product Assessment | ||
---|---|---|---|---|
Press and Shearing Machine | Opto-electronic (Type A-1) | 78,000 | 110,000 | |
Opto-electronic (Type A-2) | 78,000 | 115,000 | ||
Two-hand Control (Type B-1) | 78,000 | 13,000 | ||
Two-hand Control (Type B-2) | 78,000 | 18,000 | ||
Guard (Type C) | 78,000 | 28,000 | ||
Sweep (Type D) | 78,000 | 11,000 | ||
Pull Back/Out (Type E) | 78,000 | 13,000 | ||
Crane and Lift | Overload Protective Device (Type J-1, Electronic) | 78,000 | 60,000 | |
Overload Protective Device (Type J-2, Electronic) | 78,000 | 52,000 | ||
Overload Protective Device (Type J-3, Mechanical) | 78,000 | 49,000 | ||
Boiler | Safety Valve | 78,000 | 58,000 | |
Pressure Vessel | Safety Valve | 78,000 | 58,000 | |
Pressure Vessel | Rupture Disk | 78,000 | 50,000 | |
Insulation Apparatus for Voltage Resistance and Live-line Work | Apparatus for Live-line Work | 78,000 | Insulation Bar | 89,000 |
Insulation Apparatus | 78,000 | Insulation Guard/Cover | 68,000 | |
Track Hose, etc. | 98,000 | |||
Insulation Mat | 100,000 | |||
Insulation Blanket | 85,000 |
※ The expense of Assessment on Technical Capability and Production System follows the announcement 2017-53 of Ministry of Employment and Labor.
※ The product Assessment fee may vary by a type of product.
Safety Certification Subject | Document Assessment | |
---|---|---|
Explosion-proof Electrical Apparatus |
Ex-proof Equipment protection by “d”, “p”, “e” ... etc (except Entry devices and Intrinsic safety “i”) |
93,000 |
Flameproof entry devices | 31,000 | |
Intrinsic safety “i” | 125,000 |
※ The expense of Assessment on Technical Capability and Production System follows the announcement 2020-31 of Ministry of Employment and Labor.
Safety Certification Subject | Document Assessment | Product Assessment | ||
---|---|---|---|---|
Temporary Construction Equipment and Material | Pipe Support | 31,000 | 42,000 | |
Parts of Frame Supporting Pipe | Main Frame | 31,000 | 63,000 | |
Bracing Part | 31,000 | 34,000 | ||
Connecting Joint | 31,000 | 33,000 | ||
Parts of System Supporting Pipe | Vertical Part | 31,000 | 54,000 | |
Horizontal Part | 31,000 | 49,000 | ||
Bracing Part | 31,000 | 34,000 | ||
Truss | 31,000 | 51,000 | ||
Connecting Joint | 31,000 | 33,000 | ||
Parts of Steel-Pipe Scaffold | Steel-Pipe Joint | 31,000 | 35,000 | |
Wall-Fastening Bar | 31,000 | 35,000 | ||
Parts of Frame Scaffold | Main Frame | 31,000 | 57,000 | |
Cross-Bracing | 31,000 | 22,000 | ||
Connecting Frame | 31,000 | 45,000 | ||
Connecting Pin of Main Frame | 31,000 | 20,000 | ||
Parts of System Scaffold | Vertical Part | 31,000 | 54,000 | |
Horizontal Part | 31,000 | 49,000 | ||
Cross-Bracing | 31,000 | 34,000 | ||
Connecting Joint | 31,000 | 33,000 | ||
Parts of Portable Scaffold | Main Frame | 31,000 | 39,000 | |
Footing Wheel | 31,000 | 39,000 | ||
Railing Frame | 31,000 | 49,000 | ||
Outrigger | 31,000 | 41,000 | ||
Working Footing | Working Platform | 31,000 | 95,000 | |
Footing for Passage | 31,000 | 57,000 | ||
Fastening Bar | Clamp | 31,000 | 13,000 | |
Clamp for H-beam | 31,000 | 28,000 | ||
Post | Adjustable Post | 31,000 | 21,000 | |
Pivot Post | 31,000 | 56,000 | ||
Safety Railing for Assembly | 31,000 | 121,000 |