HOME Our Business Self-declaration of Conformity System(KCs) Types and Procedures Fee
| Machine and Apparatus for Self-declaration of Conformity System | Product Assessment | Remark | |||
|---|---|---|---|---|---|
| Acetylene Welding Machine | Flash Back Arrestor | Total | 28,000 | ||
| 1. Visual Inspection | 5,000 | ||||
| 2. Pressure Inspection | 2,000 | ||||
| 3. Tightness Inspection | 2,000 | ||||
| 4. Backdraft Prevention Inspection | 2,000 | ||||
| 5. Backfire Prevention Inspection | 10,000 | ||||
| 6. Gas Pressure Loss Inspection | 3,000 | ||||
| 7. Discharging Device Operation Inspection | 4,000 | ||||
| AC Arc Welding Machine | Automatic Electric Shock Protector | Total | 80,000 | ||
| 1. Visual Inspection | 7,000 | ||||
| 2. Inspection on Tolerance Range of Source Voltage Fluctuation | 1,000 | ||||
| 3. Capacity of Applying Condenser and Voltage of Condenser Circuit | 1,000 | ||||
| 4. Impact Resistance Inspection | 1,000 | ||||
| 5. Temperature-rise Inspection | 2,000 | ||||
| 6. Insulation Resistance Inspection | 2,000 | ||||
| 7. Voltage Resistance Inspection | 2,000 | ||||
| 8. Characteristic Inspection | |||||
| - Output-side No-load Inspection | 1,000 | ||||
| - Start-up Time | 2,000 | ||||
| - Switching Operation (vibration sound) | 5,000 | ||||
| - Delay Time | 2,000 | ||||
| - Start-up Sensitivity | 2,000 | ||||
| 9. Noise Inspection | 15,000 | ||||
| 10. Inspection on Operation of Main Controlling Device and Switching of Point of Contact | 25,000 | ||||
| 11. Signal Light Operation Inspection | 6,000 | ||||
| 12. Detecting Element Operation Inspection | 2,000 | ||||
| 13. Operational Status Verification Inspection | 4,000 | ||||
| Roller | Emergency Stop Device | Total | 13,000 | ||
| 1. Visual Inspection | 5,000 | ||||
| 2. Insulation Resistance Inspection | 3,000 | ||||
| 3. Voltage Resistance Inspection | 2,000 | ||||
| 4. No-load Operation Inspection | 3,000 | ||||
| Grinding Machine | Guard | Total | 8,000 | ||
| 1. Visual Inspection | 5,000 | ||||
| 2. Operation Inspection | 3,000 | ||||
| Wood-working Circular Saw | Guard and Repulsion Protector | Total | 8,000 | ||
| 1. Visual Inspection | 5,000 | ||||
| 2. Operation Inspection | 3,000 | ||||
| Wood-working Circular Saw | Guard and Repulsion Protector | Total | 8,000 | ||
| 1. Visual Inspection | 5,000 | ||||
| 2. Adherence Inspection | 3,000 | ||||
| Manual Wood-working Milling Tool | Guard | Total | 8,000 | ||
| 1. Visual Inspection | 5,000 | ||||
| 2. Operation Inspection | 3,000 | ||||
| Industrial Robot | Safety Mat | Total | Type A For Large Person | 90,000 | |
| Type B For Large Person | 117,000 | ||||
| Type A For Small and Large Person | 98,000 | ||||
| Type B For Small and Large Person | 130,000 | ||||
| 1. Visual Inspection | 3,000 | ||||
| 2. Working Load | |||||
| - Type A: For Large Person | 18,000 | ||||
| : For Small and Large Person | 26,000 | ||||
| - Type B: For Large Person | 45,000 | ||||
| : For Small and Large Person | 58,000 | ||||
| 3. Sensitive Time Inspection | 7,000 | ||||
| 4. Static Load Inspection | 12,000 | ||||
| 5. Endurance Inspection | 23,000 | ||||
| 6. Output Inspection | 15,000 | ||||
| 7. Open Circuit Alarm Inspection | 12,000 | ||||
| Machine and Apparatus for Self-declaration of Conformity System | Product Assessment | Remark | ||
|---|---|---|---|---|
| Personal Protective Equipment | Protective Goggle | Total | 91,000 | |
| 1. Visual Scope Inspection | 8,000 | |||
| 2. Corrosion Resistance Inspection | 11,000 | |||
| 3. Surface Inspection | 11,000 | |||
| 4. Impact Resistance Inspection | 11,000 | |||
| 5. Refraction Power Inspection | 11,000 | |||
| 6. Transmissivity Inspection | 28,000 | |||
| 7. Ignition Resistance Inspection | 11,000 | |||
| Welding Facial Shield | Total | 103,000 | ||
| 1. Protection Scope Inspection | 9,000 | |||
| 2. Impact Resistance Inspection | 11,000 | |||
| 3. Refraction Power Inspection | 11,000 | |||
| 4. Transmissivity Inspection | 28,000 | |||
| 5. Surface Inspection | 11,000 | |||
| 6. Deterioration Resistance Inspection | 11,000 | |||
| 7. Corrosion Resistance Inspection | 11,000 | |||
| 8. Ignition Resistance Inspection | 11,000 | |||
| Industrial Safety Helmet | Total | 35,000 | ||
| 1. Penetration Resistance Inspection | 9,000 | |||
| 2. Impact Absorption Inspection | 9,000 | |||
| 3. Flame Resistance Inspection | 4,000 | |||
| 4. Chin Strap Untangling Inspection | 4,000 | |||
| 5. Side Deformation Protection Inspection | 9,000 | Optional | ||
| Diving Apparatus | Total | 403,000 | ||
| 1. Visual Inspection | 5,000 | |||
| 2. Measurement of Viewing Angle | 9,000 | |||
| 3. Pressure Inspection of Component for Low-pressure and High Pressure | 46,000 | |||
| 4. Seawater Inspection | 18,000 | |||
| 5. Cleaning Agent and Antiseptic | 10,000 | |||
| 6. Gas Supply Hose | 90,000 | |||
| 7. Harness Tension | 10,000 | |||
| 8. Hoist Harness Inspection | 10,000 | |||
| 9. Facial Window Impact Inspection | 11,000 | |||
| 10. Head Protection | 9,000 | |||
| 11. Structure of Main Body | 11,000 | |||
| 12. Lifeline and Hose | 60,000 | |||
| 13. Diving Controller | 18,000 | |||
| 14. Pressure Gauge, etc. | 18,000 | |||
| 15. Communication Device | 18,000 | |||
| 16. Connection Device | 10,000 | |||
| 17. Carbon Dioxide Emission Capability | 50,000 | |||
| Machine and Apparatus for Self-declaration of Conformity System | Product Assessment | Remark | ||
|---|---|---|---|---|
| Temporary Construction Equipment and Material | Bracket for Scaffold | Total | 31,000 | |
| 1. Visual Inspection | 11,000 | |||
| 2. Compression Strength Inspection | 13,000 | |||
| 3. Slip Inspection of Attached Hardware | 7,000 | |||
| Steel Pipe for Pipe Support | Total | 7,000 | ||
| 1. Visual Inspection | 7,000 | |||
| Fixed Post | Total | 10,000 | ||
| 1. Visual Inspection | 10,000 | |||
| Hanging Chain for Scaffold | Total | 20,000 | ||
| 1. Visual Inspection | 7,000 | |||
| 2. Tensile Strength Inspection | 13,000 | |||
| Hanging Frame for Scaffold | Total | 22,000 | ||
| 1. Visual Inspection | 7,000 | |||
| 2. Level of Deflection | 3,000 | |||
| 3. Deflection Strength | 4,000 | |||
| 4. Horizontal Displacement | 8,000 | |||
| Protection Fan | Total | 30,000 | ||
| 1. Visual Inspection | 11,000 | |||
| 2. Level of Vertical Deflection | 9,000 | |||
| 3. Deflection Strength | 10,000 | |||
| Handrail Frame for Opening Part of Elevator | Total | 24,000 | ||
| 1. Visual Inspection | 11,000 | |||
| 2. Level of Deflection | 7,000 | |||
| 3. Deflection Strength | 6,000 | |||
| Bracket for Sidewall | Total | 41,000 | ||
| 1. Visual Inspection | 15,000 | |||
| 2. Level of Vertical Deflection | 9,000 | |||
| 3. Maximum Load | 17,000 | |||